Key Factors That Ensure Your Roofing Installation Passes Inspection
- joseph lemus
- Jan 6
- 3 min read

A roofing installation that fails inspection can cause costly delays, repairs, and safety concerns. Passing inspection means your roof meets local building codes and industry standards, providing protection and durability for years to come. Understanding what inspectors look for can help you avoid common pitfalls and ensure your roofing project goes smoothly from start to finish.
Understanding Roofing Inspection Requirements
Roofing inspections focus on safety, structural integrity, and compliance with building codes. Inspectors check that the installation follows manufacturer guidelines and local regulations. These requirements vary by region but generally cover:
Proper materials and installation techniques
Adequate ventilation and drainage
Secure attachment of roofing components
Correct flashing and sealing around roof penetrations
Compliance with fire resistance and wind uplift standards
Knowing these basics helps you prepare and communicate effectively with your contractor.
Choosing Quality Materials and Products
One of the first steps to passing inspection is using the right materials. Inspectors verify that roofing shingles, underlayment, flashing, and fasteners meet code and manufacturer specifications. For example, using roofing nails that are too short or made of the wrong metal can lead to failure under wind pressure.
Opt for materials with proper certifications and warranties. For instance, asphalt shingles should carry an Underwriters Laboratories (UL) rating for fire resistance. Using certified products reduces the chance of rejection during inspection.
Proper Roof Deck Preparation
The roof deck forms the foundation for the entire roofing system. Inspectors look for a clean, dry, and structurally sound deck before installation. Common issues that cause failures include:
Rotting or damaged wood sheathing
Loose or missing nails
Uneven surfaces that prevent proper shingle alignment
Contractors should replace damaged decking and secure loose boards before installing roofing materials. A well-prepared deck ensures shingles lay flat and fasteners hold firmly.
Correct Installation Techniques
Following manufacturer instructions and building codes during installation is critical. Inspectors check for:
Proper nailing patterns and spacing
Correct overlap of shingles or tiles
Installation of ice and water shields in vulnerable areas
Adequate ventilation to prevent moisture buildup
For example, nails should penetrate at least 3/4 inch into the roof deck or through the deck if it is less than 3/4 inch thick. Missing or improperly placed nails can cause shingles to lift or blow off.
Ice and water shields are essential along eaves and valleys in cold climates to prevent leaks from ice dams. Inspectors verify these membranes are installed continuously and without gaps.
Flashing and Sealing Details
Flashing protects roof joints and penetrations such as chimneys, vents, and skylights. Inspectors pay close attention to flashing installation because improper flashing is a leading cause of leaks.
Key points include:
Flashing must be made of durable, corrosion-resistant materials
It should be integrated under shingles and sealed with roofing cement or approved sealants
Step flashing should be installed along roof-to-wall intersections
Pipe boots and vent collars must fit snugly and be sealed
Proper flashing prevents water infiltration and extends the roof’s lifespan.
Ensuring Adequate Ventilation
Roof ventilation balances attic temperature and moisture levels. Inspectors verify that intake vents (usually soffit vents) and exhaust vents (ridge or roof vents) are installed correctly and sized appropriately.
Poor ventilation can cause:
Premature shingle aging
Mold and mildew growth
Ice dam formation in winter
A common rule is to provide 1 square foot of ventilation for every 150 square feet of attic space, split evenly between intake and exhaust. Contractors should avoid blocking vents with insulation or debris.
Final Inspection Checklist
Before scheduling the official inspection, use this checklist to catch common issues:
All shingles are aligned and securely fastened
Flashing is installed and sealed properly
Gutters and downspouts are attached and clear
Roof penetrations are sealed and flashed
Ventilation openings are unobstructed
Roof surface is clean of debris and excess materials
Having a thorough pre-inspection walkthrough can save time and money by addressing problems early.
What Happens If Your Roof Fails Inspection
If the inspector finds problems, they will issue a list of corrections. You must fix these issues before the final approval. Common reasons for failure include:
Missing or improperly installed flashing
Incorrect nail placement or quantity
Use of unapproved materials
Poor ventilation setup
Work closely with your contractor to understand the inspector’s notes and complete repairs promptly. Passing the inspection ensures your roof is safe, durable, and compliant.
A roofing installation that passes inspection protects your home and investment. Focus on quality materials, proper preparation, and following installation guidelines. Communicate with your contractor and schedule a pre-inspection walkthrough to catch issues early. Taking these steps helps you avoid costly delays and enjoy a strong, reliable roof for years.



Comments